Project

S/N PROJECT CLIENT DATE
1.        Roofing Of An Administrative Complex Unimalt

Aba

2006
2.        Fabrication Of Many Units Of 45,000litres Of Underground Storage Tank CCECC FCT Abuja 2007
3.        Fabrication Of 1 Unit Of 20,000 Gallons Water Tank On Tower Povo – Mek NDDC Project Ukwa Abia State 2007
4.        Fabrication Of 7 Units Of 33,000 Litres Underground Tank CCECC FCT Abuja 2007
5.        Fabrication Of 10 Units Of 20,000 Gallons Tank Global Project

(Bayelsa State)

 

2006 – 2007

6.        Fabrication And Erection Of Roof Members

On Stacked Containers

Saima Port Harcourt  

2007

7.        Diamond bank Mini building Diamond bank Kano 2007
8.        Design and fabrication of 4.4 million liters AGO storage tank (API 50)at Iwofe depot Delmar Petroleum company ltd Port Harcourt PIEW worked as a subcontractor to TESL 2007
9.        NDT inspection and clearing of two AGO storage tanks Delmar Petroleum company ltd Port Harcourt PIEW worked as a subcontractor to TESL 2007

 

10.    Design of 70kl slop pressure tank (API 620) Indorama Eleme Petrochemical Company Ltd Port Harcourt PIEW worked as a subcontractor to TESL 2007
11.    NDT of Delmar Eagle, a product vessel Delmar Petroleum company ltd Port Harcourt PIEW worked as a subcontractor to TESL 2007

 

12.    Design of 7 nos 10 million liters tank EFZ Calabar Creek field Energies Ltd worked as Subcontractor 2007
13.    Fabrication and erection of 70kl slop pressure tank (API 620) Indorama Eleme Petrochemical Company Ltd Port Harcourt PIEW worked as a subcontractor to TESL 2008
14.    Failure analysis of piping and fitting 1 Olefins plant Indorama Eleme Petrochemical Company Ltd Port Harcourt PIEW worked as a subcontractor to TESL 2008
15.    Fabrication Of Tank Rings Rockson Engineering Port Harcourt 2008
16.    Fabrication of Dish-end for Tanks Rockson Engineering Port Harcourt 2008
17.    Fabrication Of Many Units Of 45,000litres Of Underground Storage Tank African Petroleum Lagos  

2008

18.    Fabrication of trusses/ Roofing PW Ltd Residence PW Ltd Jos

Plateau State

2008
19.    Fabrication Of Many Units Of 33000litres Of Underground Storage Tank CCECC/Central bank

Asaba Delta State

2009
20.    3500 liters (Diesel generator tanks) CCECC/

Central bank Asaba

2009
21.    Fabrication Of Many Units Of Rectangular floaters Manhill Nig Ltd Lagos 2009
22.    Fabrication   of many units of 2.4m diameter by

7m long steel pipe with 10mm

steel plate

DNL Engineering 2010
23.    Design,   fabrication and erection of roof trusses for a church building St Michael’s Cath church Mgbakonta Abia State 2010
24.    Design,   fabrication and erection of roof trusses for a school building Queen of Peace Private School Buruku Jos Plateau State 2010
25.    Fabrication and Erection of warehouse Proposed Export Crop Handling, Preservation & conditioning Centre Emene Enugu 2010-2011
26.    Fabrication And Erection Of Two Security Towers Cum Lighting Mast. Yade Barge Operators

Kwale Jetty.

2010
27.    Fabrication, Erection, inspection, testing and flushing of fire water pipeline and process piping. United Oil Productions System Limited, Kwale, Delta State.  

2010-2011

28.    Design, Fabrication and Erection of roof trusses for a church building Holy Family Catholic Church, Umunocha Awka Etiti. 2011-2012
29.    Fabrication of 5 units of Baskets MGM Logistics Solution Services Ltd, Onne Port, Port-Harcourt 2012
30.    Design, Fabrication and Erection of roof trusses of Generator house Extension. Atom Plast Limited Aba, Abia State. 2012

 

31.    Design, Fabrication and Erection of pipe rack Atom Plast Limited Aba, Abia State 2012
32.    Design and Fabrication of Underground tanks Pinnacle Oil and Gas Ltd 2013
33.    Design and construction of Town Hall for Imagbon Community Ijebu-Ode Consolidated Breweries 2013
34.    Design and fabrication of 1.6m dia. x 7.5m lg. x 4mm thick & 1.6m dia. x 4.5m lg. x 4mm thick casing pipe. Rivigo J.V Nig. Ltd 2013
35.    Design and construction of Loading Gantry Pinnacle Oil & Gas Ltd 2014
36.    Design, Fabrication and Erection of Crane Beams and Hangers Lingo Nigeria Limited On going
37.    Design and construction of sub-structure for TDU 3 & 4 and foundation of hot air reactor-2 units @ SEEPCO Mud Plant yard Kwale Delta State PSCIL On going
38.     Fabrication of Pipe Casing Zerock Construction Company